Number of visits:28 Seconds Update time:2024-12-16
Customer: A European daily necessities company
Demand: Electric transfer cart for mold
Dimension requirements: 1500*1200*650mm (length, width and height), compact size, difficult design
Production cycle: Only 14 days, tight time
Compact size:
Design challenge: Achieving a load capacity of 10 tons in such a small size places extremely high demands on the vehicle's structural strength, material selection and layout design.
Solution: Use high-strength steel and optimized structural design to ensure sufficient load-bearing capacity and stability within a limited size. At the same time, through precise calculation and optimized layout, maximize the use of space to ensure that the transfer cart has sufficient strength and functionality while meeting the size requirements.
Fast production:
Production challenge: A 14-day production cycle is a daunting task for any custom mold cart project, requiring efficient supply chain management, fast production processes and strict quality control.
Solution: Maintain close communication with customers to ensure rapid confirmation and modification of design plans. Communicate efficiently with procurement and production to ensure rapid procurement and processing of raw materials.
Customer Cooperation and Collaboration
Communication efficiency: Maintain smooth communication with customers to ensure clear requirements, timely confirmation of design plans, and quick response to any adjustments in the production process.
Technical support: Provide customers with necessary technical support and answers during the design and production process to ensure that customers have a clear understanding of the progress and results of the project.
Delivery acceptance: After the project is completed, conduct detailed delivery acceptance with the customer to ensure that the vehicle meets the design requirements and provide customers with necessary operation and maintenance training.
Project results
On-time delivery: The production and delivery of the custom electric transfer cart were successfully completed within the specified 14-day production cycle.
Customer satisfaction: The customer was satisfied with the quality and performance of the customized vehicle and gave positive feedback and recognition.